Université de Liège Réseau des Bibliothèques

BICTEL/e - ULg
Serveur institutionnel des thèses de doctorat



Nouvelles thèses
dans BICTEL/e - ULg
  • Sharma, Henu - Theoretical studies of PbTiO3 and SrTiO3 under uniaxial mechanical constraints combining first-principles calculations and phenomenological Landau theory
  • Gennotte, Vincent - Biologie de la reproduction et analyse du déterminisme et de la différenciation du sexe à des stades précoces chez le tilapia du Nil, Oreochromis niloticus/Reproductive biology and analysis of sex determinism and differentiation at early developmental stages in Nile tilapia, Oreochromis niloticus
  • André, Cédric - Audiovisual spatial congruence, and applications to 3D sound and stereoscopic video.
Présentation Recherche thèse Dépôt thèse Accès
gestionnaires
 
Page de résumé pour ULgetd-06162010-100420

Auteur : Marinakis, Adamantios
E-mail de l'auteur : diama100@yahoo.com
URN : ULgetd-06162010-100420
Langue : Anglais/English
Titre : Multi-actor optimization-based coordination of interacting power flow control devices or competing transaction schedulers in overlapping electricity markets
Intitulé du diplôme : Doctorat en sciences de l'ingénieur
Département : FSA - Département d'électricité, électronique et informatique
Jury :
Nom : Titre :
BAKIRTZIS, Anastasios Membre du jury/Committee Member
CONEJO, Antonio J. Membre du jury/Committee Member
ERNST, Damien Membre du jury/Committee Member
STRBAC, Goran Membre du jury/Committee Member
WEHENKEL, Louis Président du jury/Committee Chair
VAN CUTSEM, Thierry Promoteur/Director
Mots-clés :
  • multi-objective optimization
  • market coupling
  • game theory
  • overlapping markets
  • electricity markets
  • congestion management
  • phase shifting transformer
  • phase shifter
Date de soutenance : 2010-06-18
Type d'accès : Public/Internet
Résumé :

This work deals with problems where multiple actors simultaneously take control decisions and implement the

corresponding actions in large multi-area power systems. The fact that those actions take place in the same

transmission grid introduces a coupling between the various decision-making problems. First, transmission

constraints involving all actors' controls must be satisfied, while, second, the satisfaction of an actor's

operational objective depends, in general, not only on its own actions but on the others' too.

Algorithms and/or operational procedures are, thus, developed seeking to reconcile the multiple actors'

simultaneous decisions. The confidentiality and operational autonomy of the actors' decision-making procedures are preserved.

In particular, two specific problems leading to such a multi-actor situation have been treated.

The first is drawn from a recently emerging situation, at least in Europe, where several Transmission System

Operators (TSOs) have installed and/or are planning to install Phase Shifting Transformers (PSTs) in such

locations in their areas that, by properly adjusting the PST phase angle settings, they can significantly control

the power flows entering and exiting their systems.

A general framework is proposed for the control of PSTs owned by several TSOs, taking into account their interactions. The proposed solution is the Nash equilibrium of a sequence of optimizations performed by the

various TSOs, each of them taking into account the other TSOs' control settings as well as operating constraints relative to the whole system. The method is applied to a linearized network model and illustrated on the IEEE 118-bus system.

The second multi-actor situation dealt with in this work stems from the recently increasing amount of discussions and efforts made towards creating the right market structures and operational practices that would facilitate a seamless inter-area trade of electricity throughout large interconnections. In this respect, in accordance with European Union's goal of a fully functional Internal Electricity Market where ideally every consumer will be able to buy electric energy from every producer all across the interconnection, the possibility of every market participant to place its bid in whatever electricity market of an interconnection has been considered.

This results in overlapping markets, each with its own schedule of power injections and withdraws, comprising

buses all around the interconnection, that are cleared simultaneously by Transaction Schedulers (TSs). An

iterative procedure is proposed to reconcile the various TS schedules such that congestion is managed in a fair

and efficient way. The procedure converges to such schedules that the various TS market clearings are in a Nash equilibrium. The method is then extended towards several directions: enabling market participants to place their bids simultaneously in more than one TS's market, incorporating $N-1$ security constraints, allowing for joint

energy-reserve dispatch, and, accounting for transmission losses.

The corresponding iterative algorithms are thoroughly illustrated in detail on a 15-bus as well as the IEEE RTS-96

system.

Autre version :
Fichiers :
Nom du fichier Taille Temps de chargement évalué (HH:MI:SS)
Modem 56K ADSL
[Public/Internet] AdamantiosMarinakis_PhDThesis.pdf 1.59 Mb 00:03:47 00:00:08

Bien que le maximum ait été fait pour que les droits des ayants-droits soient respectés, si un de ceux-ci constatait qu'une oeuvre sur laquelle il a des droits a été utilisée dans BICTEL/e ULg sans son autorisation explicite, il est invité à prendre contact le plus rapidement possible avec la Direction du Réseau des Bibliothèques.


Parcourir BICTEL/e par Auteur|Département | Rechercher dans BICTEL/e


© Réseau des Bibliothèques de l'ULg, Grande traverse, 12 B37 4000 LIEGE